The Purple Cloud by M P Shiel

The Purple Cloud by M P Shiel

Author:M P Shiel [Shiel, M P]
Language: eng
Format: epub
ISBN: 9780141967585
Publisher: Penguin Books Ltd
Published: 2012-07-26T00:00:00+00:00


Save for a time, near Cairo, I did not once stop on that homeward voyage, but turned into the little harbour at Imbros at a tranquil sunset on the 7th of March (as I reckon), and I moored the Speranza to the ring in the little quay, and I raised the battered motor from the hold with the middle air-engine (battered by the typhoon in the mid-Pacific, which had broken it from the rope-fastenings and tumbled it head-over-heels to port), and I went through the windowless village-street, and up through the plantains and cypresses which I knew, and the Nile mimosas, and mulberries, and Trebizond palms, and pines, and acacias, and fig-trees, till the thicket stopped me, and I had to alight: for in those two years the path had finally disappeared; and on, on foot, I made my way, till I came to the board-bridge, and leant there, and looked at the rill; and thence climbed the steep path in the sward toward that rolling table-land where I had built with many a groan; and halfway up, I saw the tip of the crane-arm, then the blazing top of the south pillar, then the shed-roof, then the platform, a blinking blotch of glory to the watery eyes under the setting sun. But the tent, and nearly all that it contained, was gone.

For four days I would do nothing, simply lying and watching, shirking a load so huge: but on the fifth morning I languidly began something: and I had not worked an hour, when a fever took me – to finish it, to finish it – and it lasted upon me, with only three brief intervals, nearly seven years; nor would the end have been so long in coming, but for the unexpected difficulty of getting the four flat roofs water-tight, for I had to take down half the east one. Finally, I made them of gold slabs one-and-a-quarter inch thick, smooth on both sides, on each beam double gutters being fixed along each side of the top flange to catch any leakage at the joints, which are filled with slaters’-cement. The slabs are clamped to the top flanges by steel clips, having bolts set with plaster-of-Paris in holes drilled in the slabs. These clips are 11/2 in. by 3/17 in., and are 17 in. apart. The roofs are slightly pitched to the front edges, where they drain into gold-plated copper-gutters on plated wrought-iron brackets, with one side flashed up over the blocks, which raise the slabs from the beam-tops, to clear the joint gutters… But now I babble again of that base servitude, which I would forget, but cannot: for every measurement, bolt, ring, is in my brain, like a burden; but it is past, it is past – and it was vanity.

Six months ago to-day it was finished: six months more protracted, desolate, burdened, than all those sixteen years in which I built.

I wonder what a man – another man – some Shah, or Tsar, of that



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.