17.2.1 Creating a line of balance chart

A line of balance chart is created by plotting the output (in no. of units completed, m2, etc.) on the y axis, and time on the x axis. Thus, a chart can be produced (Figure 17.4).

When the plotting of work is complete, it should then be possible to analyse the trades that are influencing the overall project duration due to their slower rate of progress. In the example below, the mechanical & electrical 1st fix and partitions 2nd fix are progressing at a slower rate. The possibility of optimising the duration, for example by increasing resources on these two tasks, can be examined and put into practice as appropriate (Figure 17.5).



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.