(11.17)

In this chapter the JRP model with budget and capacity constraints in the warehouse is presented, so the optimal cycle time T0 must be calculated from Eqs. (11.8) and (11.11) for each IGS or DGS respectively. The cycle times and for the budget and maximum capacity constraints must be calculated with Eqs. (11.18) and (11.19) for IGS, and (11.20) and (11.21) for the DGS. For DGS, as presented in Eqs. (11.20) and (11.21), there are as many restrictions as number of groups j.

(11.18)

(11.19)