9781787374843 by Anonymous

9781787374843 by Anonymous

Author:Anonymous [Anonymous]
Language: eng
Format: epub
Published: 2017-08-01T00:00:00+00:00


Russia, after the war with Japan, was faced with the problem of constructing her navy anew, and by August 1914 the reconstruction was far from complete. The Navy Bill of 1912 had provided for the expenditure of £50,000,000 on a building programme to be completed in 1917, and she had aimed at creating a powerful Baltic battle fleet, which should be scarcely inferior to any power Germany could place in those waters. But this policy was not given time to mature. On the outbreak of war she had in the Baltic only four Dreadnoughts, ten armoured cruisers, two light cruisers, eighty destroyers, and twenty-four submarines, and a fleet of about half the strength in the Black Sea. Its bases were Kronstadt, an ice-bound port in winter, the minor ice-free base of Libau, and Sveaborg for torpedo craft. The projected ice-free base of Reval was not yet completed.



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.