623

A construction project is broken down into seven stages (A–G). The sequencing of these stages is represented by a Gantt chart as shown in the following figure. The time axis is marked in units of (5-day) weeks. The Gantt chart shows current completion levels (shaded in gray) superimposed on the initially planned timeline. The current status of the project at 4 weeks 2 days is shown here. Which of the following statements is true?

A. All activities in stage E must be complete before the initiation of stage G.

B. The only stage which is on or ahead of schedule is G.

C. Stages A and D are behind schedule.

D. Of ongoing or completed stages, those with the lowest levels of completion are C and D.