Externally applied insulation on a masonry wall around a window frame. Joints should be staggered by 20cm so that air penetration is limited. Fill joints with supplied foam filler, and ensure the use of thermally broken anchor fixings.

Junction between timber floor and masonry wall, retrofit detail

1. Initial plastering (parging) of the floor void between the floor joists – the airtight layer is the gypsum plaster. This is non-standard practice; in a conventional build this void is left as bare block or brickwork.