101 Case Studies in Construction Management by Unknown

101 Case Studies in Construction Management by Unknown

Author:Unknown
Language: eng
Format: epub


Comments

Owner will handle

Submittal outstanding

Safety issue

More sustainable

Date

02/12/2019

02/12/2019

02/15/2019

02/25/2019

Value

Rejected

$25,000

0

($1,500)

0

Value

Accepted

$0

$7,500

0

($17,022)

King County Builders, Inc.

Health and Wellness, MOB

Value Engineering Log

Value

Proposed

$25,000

$7,500

($1,500)

($17,022)

Updated: 03/20/2019

Date

Proposed

02/10/2019

02/12/2019

02/12/2019

02/20/2019

. . .

Value engineering log

Description

KCB install additional FIO equipment

Replace VCT with sheet vinyl floor

Delete door vision glass

Use drought-resistant plants, delete irrigation

continued

TABLE 7.1

Item

8

10

11

15

Start-up 83

b. Should the GC receive a portion of VE savings? Should there be some fee enhancement? Is there a potential for fee reduction? What incentive does the GC have to reduce the cost of the project?



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.