At the end of the iterative testing subphase, there is a set of documented testing outcomes that can be used to correct all defects and modify all developed solution capabilities.

Final testing

The final testing phase happens after all iterations are finished and the Power Platform solution is considered ready. The purpose of the final testing is to perform all end-to-end tests of the solution, to verify that the solution fulfills customer requirements, and to prepare the solution deployment. This phase usually takes several weeks, and the main activity is the official UAT. The testing activities are performed on a dedicated UAT environment. Typical activities in the final testing phase are as follows:

Finalize the testing strategy and UAT test scripts.

Prepare a Power Platform UAT testing environment, load the final solution, and test the data.

Perform a key user/train-the-trainer training.

Perform the UAT.

Perform the final data migration tests.

Finalize the training materials.

Prepare a Power Platform production environment.

Update the project plan, Azure DevOps board, solution architecture, solution design, and other main project documents.

A decision for deployment and go live is made.