Master Planning in Manufacturing using Microsoft Dynamics 365 for Operations: 2017 Edition by Scott Hamilton

Master Planning in Manufacturing using Microsoft Dynamics 365 for Operations: 2017 Edition by Scott Hamilton

Author:Scott Hamilton [Hamilton, Scott]
Language: eng
Format: azw3
Publisher: Scott Hamilton
Published: 2017-03-05T05:00:00+00:00


Rationale for Multiple BOM Versions for an Item Multiple BOM versions can be defined for an item, typically to support the following situations.

♦ Variations between sites producing the same manufactured item

♦ Planned changes with effectivity dates

♦ Variations that reflect larger production quantities

♦ Alternate bills of material. An alternate bill of material is typically an approved-but-not-active BOM version that can be specified for a manuallycreated production order or rework order. It can also be specified for a sales order line item (for a make-to-order product) or for a BOM line about a manufactured component, so that master planning logic employs the specified BOM version rather than the active version.

♦ Revision levels of a manufactured item, as illustrated in Case 10.1

♦ Engineering versus production BOMs, as illustrated in Case 10.5

♦ Prototypes or production ramp-up



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.