Provide cell F10 in the Cell Reference, as shown in figure 3.27:/p>

Figure 3.27: Add Cell Reference

Set the logical operator to <=, as shown in figure 3.28:

Figure 3.28: Add the logical operator

Lastly, set the upper limit of the number of hours per day for cutting, which is stored in cell F12, for the Constraint. So, set Constraint to F12, as shown in figure 3.29:

Figure 3.29: Add Constraint

Now that the constraint has been defined, click on OK, as shown in figure 3.30:

Figure 3.30: Click on OK to add the constraint