The Perfect Design: Eligible Bachelors by Marissa Davis

The Perfect Design: Eligible Bachelors by Marissa Davis

Author:Marissa Davis [Davis, Marissa]
Language: eng
Format: epub
Published: 2024-04-11T00:00:00+00:00


Chapter 6

Ian

A month has passed since this project in West Jefferson started, and so far, plans for the additions on Tori’s old farm house are going well.

The home, originally built in the late 1800’s, has a good backbone. The load bearing walls are in great shape; we have plenty to work with.

The downstairs is outfitted with a large kitchen, a breakfast nook, walk-in pantry, and laundry room that had previously been updated, and the new additions added about twenty years ago. The rooms original to the old house are a formal dining and living area, a front parlor room, a back sitting room, and a small washing closet. Which is a fancy way of saying there is a toilet and sink in a closet.

The main focus as you walk into the home is the foyer that showcases the grand staircase. All wood, hand-carved by masters long ago. Upstairs is divided into a master suite—again, that was updated. A spacious bathroom and walk-in closet were added at the same time as the kitchen reno was done.

The rest of upstairs houses a converted library, with wall-to-wall shelving and windows that overlook the backyard and pastures. There are three rather large bedrooms and a full bath. It’s home to a bathtub and a walk-in shower. There is also a linen closet and the door to the attic off the last landing before you go up to the master suite.

When we say it’s a grand ole house, that’s why. Spacious, open, and the architecture itself is magnificent. This is why I’ve put in so much work to make sure we match the aesthetic with the addition.

Of course, like any other building project, there have been setbacks, unpredictable problems, and the occasional WTF moments, but all in all we are close to being on schedule.

Leaning over the long table set up in the covered porch, I review the plans. The outer walls for the porch extension, the new downstairs and upstairs rooms are done. The windows are being delivered in three days, weather permitting. The flooring purchased matches what is currently throughout the house. It’s sitting in the formal living room, acclimating to the temps, waiting to be installed once it’s time.

The light fixtures, that took an act of God to find, are being unloaded from the trucks now. Sconces, a chandelier for the main room, and then the lighting fixtures for the add-ons are all brushed metal; the brassy sheen will match the rest of the home seamlessly.

The wiring has been run for the downstairs rooms; they are working on the upstairs now. Plumbing will be tweaked as they work around it. The large, handicap-accessible bathroom in the new downstairs ensuite is being worked to match the upstairs. Tile is going in the shower, and the tub is a walk-in as well. The installers will be back once we are ready for it to be put in place. It has a built-in seat so that whoever uses it can enjoy the comfort and ease of a bath without the worry of slipping and falling in the tub.



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.